Home
: Strategic Development
: Residential
: Lyndhurst
: Lyndhurst Structure Plan Printable
Version
| You can view and print each section of the Lyndhurst Structure Plan below in PDF format. View or print PDF files using Adobe Acrobat Reader (download or update for free). |
As a guide, a 300 kilobyte(KB) PDF file will take approximately 1 minute and 20 seconds to download from a 56k modem.
Download the entire document (PDF, 2.7 MB) if you have a high-speed internet connection. Alternatively use the sections below which has been broken down into sections to minimise downloading time.
Prepared for Hastings District Council By Beca Carter Hollings & Ferner Ltd August 2004.
Revision History
| Revision Nº | Prepared By | Description | Date |
| A | Don Lyon | Internal Draft for Review | March 2004 |
| B | Don Lyon | Final Draft for Consultation | June 2004 |
| C | Amelia Linzey | Final to support Plan Change | August 2004 |
| TABLE OF CONTENTS | ||
| Part | Section |
File size |
| Summary of Changes | 93 KB | |
| Part A: BACKGROUND | ||
| 1 | Introduction | 507 KB |
| 2 | Strategic and Statutory Framework | 921 KB |
| 3 | Demand and Future Growth | 239 KB |
| 4 | Structuring Constraints and Opportunities | 230 KB |
| 5 | Consultation | 201 KB |
| 6 | Structure Plan Concepts | 106 KB |
| PART B: STRUCTURE PLAN | ||
| 7 | Land Use and Amenity | 147 KB |
| 8 | Open Space | 387 KB |
| 9 | Roading and Traffic Management | 136 KB |
| 10 | Infrastructure and Utilities | 462 KB |
| 11 | Staging | 127 KB |
| 12 | Financial Contributions | 119 KB |
| 13 | Structure Concept Map | 495 KB |
Supplementary Technical Reports
- Lyndhurst Rezoning Consultation on Draft Structure Plan (178 KB)
- Reserves Strategy Review (360 KB)
- Lyndhurst Block - Assessment of Suitability for Residential Development (725 KB)
- Stormwater Issues and Options (600 MB)
- Traffic Impact Assessment Review (546 KB)
- Traffic Noise Assessment and Mitigation (399 KB)
- Stormwater Modeling (1.1 MB)
- Engineering Services Cost Estimates (429 KB)
- Preliminary Assessment of Soil Suitability for Residential Development (237 KB)
- Impact of Lyndhurst Development Stormwater on Horticultural Activities (231 KB)
More Information
Read our Lyndhurst Newsletters:
- June 2004 (PDF, 320 KB)
- December 2003
- June 2001
Contact
To discuss any aspects of the Lyndhurst Structure Plan, contact
Council's Strategic Planner, Rebecca McKenzie, on
rebeccam@hdc.govt.nz
or phone 06 878 0510 extension 8687.
Alternatively, you can contact Rowan Wallis, of Opus International
Consultants Ltd, on
rowan.wallis@opus.co.nz
or phone 06 833 5114.






