Home : Strategic
Development : Transportation :
HB Regional Traffic Study

| You can view and print each section of the Transport Study below in PDF format. View or print PDF files using Adobe Acrobat Reader (download or update for free). |
As a guide, a 300 kilobyte(KB) PDF file will take approximately 1 minute and 20 seconds to download from a 56k modem.
Download the entire document (PDF, 6.7 MB) if you have a high-speed internet connection. Alternatively use the sections below which has been broken down into sections to minimise downloading time.
Part |
Section |
File size
(KB) |
| Executive Summary | ||
| 1 | Introduction | 125 |
| 2 | Network Modelling and Validation | 401 |
| 3 | Assessment Methodology | 275 |
| 4 | Heavy Traffic and Commodity Movement | 397 |
| 5.0 | 432 | |
| 5.1.2 | 397 | |
| 5.2 | 459 | |
| 5.2.2 | 441 | |
| 6 | 359 | |
| 6.3 | 393 | |
| 6.3.2 | 426 | |
| 6.3.3 | 499 | |
| 6.4.2 | 413 | |
| 6.4.3 | 423 | |
| 6.5 | 287 | |
| 7.0 | Comparison of Competing Options - 7.2 Principal Strategy Alignment Options |
181 |
| 7.2.1 | Four lane Hawke’s Bay Expressway from Omahu to Pakowhai with Southern Expressway Extension |
254 |
| 7.2.2 | 313 | |
| 7.2.3 | 315 | |
| 7.2.4 | 291 | |
| 7.2.5 | 258 | |
| 7.2.6 | 295 | |
| 8 | Strategy Options | |
| 8.1 | 368 | |
| 8.2.1 |
Hastings Southern Arterial – Alignment A (approx cost $11.92m) |
456 |
| 8.2.2 | 470 | |
| 8.2.3 | 456 | |
| 8.2.4 | 397 | |
| 8.2.5 | Awatoto - Expressway Connection - Alignment A (approx Cost $6.48m) |
438 |
| 8.2.6 | Four Lane Prebensen Drive, Expressway - Hyderabad Road with Overpass |
454 |
| 8.2.7 | 430 | |
| 8.2.8 | Four Lane Hawke’s Bay Expressway from Omahu to Pakowhai with southern extension (B) |
531 |
| 8.2.9 | 536 | |
| 8.2.10 | 469 | |
| 8.2.11 | 432 | |
| 9 | Development of a Strategy | 918 |
| 10 | Summary | 75 |
Contact
For more information about the Regional Transport Strategy,
contact the Strategic Development team on
strategic@hdc.govt.nz or
phone 06 878 0500.






