Planned drinking water and wastewater network extensions and road safety improvements began on Middle Road in June 2024. The first stage between Breadalbane and 150 Middle Road is nearing completion. The second stage between 150 Middle Rd and Gilpin Rd has started and has an expected completion date of December 2025.

Once the second stage of the Middle Road works is finished, attention will shift to safety improvements at the intersection of Middle, Iona, and Gilpin Roads, as well as the installation of three waters infrastructure along Iona Road. The entire project is set to be completed by December 2026.

FAQs

Why are the stages of this project occurring immediately after one another?

It will be less disruptive for residents and road users in the long run, with time savings of 12-plus months. All four stages need to be completed, and removing the need for temporary reinstatement between stages contributes to the time savings. The other main time saver is closing the road to all-but residents and businesses, which enables the construction teams the room to work more quickly and safely. 

There are also projected savings of over $2 million in construction costs, compared to a traditional single-lane road works approach.

Roading MiddleRoad

Detour route for stages one and two of the project

Why is this work being done?

The project enables residential development on the southern side of Havelock North, and aligns with Hastings District Council’s multi-agency Medium and Long-Term Housing Strategy. That strategy, put together by multiple government, local government, non-government and business representatives, was developed to increase the range of housing options across the district, from social, affordable, and private developments, to papakāinga and inner-city intensification.

How will the work impact me?

Detours are in place around the closed area (although residents will have access at all times). The map shows the road closure and detour route for the first and second stages of work.
You can expect to see increased traffic on the detour route and may wish to adjust your travel plans accordingly.

Who is the contractor for this work?

Hick Bros Civil Construction Ltd (HBCC) is the civil contractor carrying out the work on behalf of Hastings District Council (HDC).

If you have any questions or concerns, please contact Hastings District Council on 06 871 5000

Loading...

Hastings District Council - Copyright © 2025 Hastings District Council

Disclaimers and Copyright
While every endeavour has been taken by the Hastings District Council to ensure that the information on this website is accurate and up to date, Hastings District Council shall not be liable for any loss suffered through the use, directly or indirectly, of information on this website. Information contained has been assembled in good faith. Some of the information available in this site is from the New Zealand Public domain and supplied by relevant government agencies. Hastings District Council cannot accept any liability for its accuracy or content. Portions of the information and material on this site, including data, pages, documents, online graphics and images are protected by copyright, unless specifically notified to the contrary. Externally sourced information or material is copyright to the respective provider.

© Hastings District Council - / +64 6 871 5000 / customerservice@hdc.govt.nz