Current filter:
Taradale Town Hall, Thursday 28 Sept, 6pm-7pm
Please join us for a short presentation from the project team developing concepts for the rebuild of the Puketapu (Vicarage) Bridge, this will include the process ahead and timeframes.
Feasibility study | July 2023 |
Mana whenua engagement and site investigations | September 2023, ongoing |
Pre-application discussions with Hawke's Bay Regional Council and demolition | October 2023 |
Draft methodology and construction drawings | TBC |
Resource consent lodgement and processing | October - November 2023 |
Packaged design delivery | TBC |
Blessing ahead of works beginning | TBC |
Works begin | Early 2024 |
Public open day | TBC |
Blessing to open bridge | Mid 2025 |
Disclaimers and Copyright
While every endeavour has been taken by the Hastings District Council to ensure that the information on this website is
accurate and up to date, Hastings District Council shall not be liable for any loss suffered through the use, directly or indirectly, of information on this website. Information contained has been assembled in good faith.
Some of the information available in this site is from the New Zealand Public domain and supplied by relevant
government agencies. Hastings District Council cannot accept any liability for its accuracy or content.
Portions of the information and material on this site, including data, pages, documents, online
graphics and images are protected by copyright, unless specifically notified to the contrary. Externally sourced
information or material is copyright to the respective provider.
© Hastings District Council - / +64 6 871 5000 / customerservice@hdc.govt.nz