skip to main content

I want to...

Current filter:

Rubbish & Recycling Rubbish & Recycling

Brookfields

Replacement of Brookfields Bridge is not in the immediate programme of work. A regional transport study is planned to be conducted during the next three years. This study aims to improve resilience by identifying the future form and function of the transport network connecting Napier and Hastings. The network that will best serve our communities into the future will be modelled and researched. This will inform the necessity and future position of the Brookfield Bridge and consider other options.

Brookfields Bridge

Cyclone Gabrielle caused more than $800 million of damage to the transport network, destroying 13 bridges and damaging an additional 40 plus that will require repair, as well destroying culverts, roads and road surfaces.  The initial focus was on emergency works to install 10 temporary bridges and make urgent repairs to reconnect communities.   In some places like Kererū Gorge and Puketapu temporary structures were not feasible, and communities remain disconnected. These areas are priorities for restoring permanent structures.  Hastings District Council is also prioritising work based on the vulnerability of roads to new weather events, levels of road use and the numbers of people affected.

While some larger programmes of emergency works such as clearing large and complex slips along Dartmoor Road are still ongoing, the focus now is on repair and restoration of the transport network so that it best serves our growing community into the future.  Due to the scale and complexity of the work required, the full programme will likely take seven to ten years to be completed. We need people driving on the network to continue to help us look after the temporary structures and diversion routes while this programme is implemented by observing weight and speed limits.

Replacement of Brookfields Bridge is not in the immediate programme of work. A regional transport study is planned to be conducted during the next three years. This study aims to improve resilience by identifying the future form and function of the transport network connecting Napier and Hastings.  The network that will best serve our communities into the future will be modelled and researched. This will inform the necessity and future position of the Brookfield Bridge and consider other options such as the expansion of the expressway to four lanes.  

Timeline

From 15 April, 2024

Damaged sections of Brookfields Bridge will be removed from the Tutaekuri River waterway, during the hours of 7am and 5pm each day. All work in the waterway is to be completed by 1 May.

Loading...

Hastings District Council - Copyright © 2024 Hastings District Council

Disclaimers and Copyright
While every endeavour has been taken by the Hastings District Council to ensure that the information on this website is accurate and up to date, Hastings District Council shall not be liable for any loss suffered through the use, directly or indirectly, of information on this website. Information contained has been assembled in good faith. Some of the information available in this site is from the New Zealand Public domain and supplied by relevant government agencies. Hastings District Council cannot accept any liability for its accuracy or content. Portions of the information and material on this site, including data, pages, documents, online graphics and images are protected by copyright, unless specifically notified to the contrary. Externally sourced information or material is copyright to the respective provider.

© Hastings District Council - / +64 6 871 5000 / customerservice@hdc.govt.nz